Stream Bank Restoration - Anchorage Cost Share

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDAK44618
Recovery Domains -
Start Date07/01/2011
End Date11/30/2014
Year2010
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


ADF&G, with project partners, helped fund seven shoreline revegetation and stabilization projects in the Anchorage area.

Three different scopes of work were implemented: 1) at one site, the riparian area was revegetated (using native vegetation and vegetated materials) and protective fencing was installed (West of University Lake); 2) at two sites, streambanks were stabilized with vegetation, the riparian area was revegetated, and fencing was installed, (2013 MOA Valley of the Moon, 2012 MOA Wickersham Park); and 3) at the remaining four sites, debris removal (including rock, sandbags, and trash) took place in addition to riparian planting, fencing, and bank stabilization (2014 Johnson Campbell Lake, 2014 MOA N. Taku Lake, 2013 Johnson Campbell Lake, 2013 MOA DOT New Seward Hwy). Bank stabilization at all sites utilized brush layers, trenched willows, live staking, and rooted alder and willow; at two sites, root wads were installed in addition to vegetation (2014 MOA N. Taku Lake, 2013 MOA DOT New Seward Hwy).

In total, over three field seasons, 245 feet of debris was removed; 1,050 feet of streambank and lakeshore were revegetated and stabilized; 9,790 square feet of riparian area was revegetated; and 2,205 feet of streambank was further protected using root wads and riparian exclusion fencing.

Project partners included the U.S. Fish and Wildlife Service (USFWS), Anchorage Waterways Council, Municipality of Anchorage, Trout Unlimited, the Alaska Railroad, Alaska Department of Transportation, and private landowners.

Project Benefit    


This project will result in the removal of detrimental structures from streams; increased fish habitat quantity and quality, riparian vegetation, riparian function, and river bank stability; and more responsible development of riparian areas. These results will help ensure healthy salmon populations and salmon habitat.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .18 .18
Riparian Habitat
  Stream Miles Treated .19 .48
  Acres Treated .7 .8

Funding Details

SourceFunds
PCSRF$119,656
Other$245,038
Report Total:$364,694


Project Map



Worksites

2014 Johnson Campbell Lake    


  • Worksite Identifier: 2014 Johnson Campbell Lake
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Knik Arm (190204)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.13336
  • Longitude: -149.946376

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 7,831.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 472.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 7,359.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Salix alaxensis, S. lasiandra, S. Sitchensis, Populus balsamnifera, Calamagrostis canadensis, Deschampsia beringensis, D. caespitosa, Leymus mollis, Festuca rubra
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .01
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .01
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing .1
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

West of University Lake (Chester Creek)    


  • Worksite Identifier: West of University Lake (Chester Creek)
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Knik Arm (190204)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.185308
  • Longitude: -149.808175

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 14,079.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 14,079.00
      •      . . . . C.5.b.1 Total riparian miles streambank treated .01
      •      . . . . C.5.b.2 Total Riparian Acres Treated .1
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . . . C.5.c.2
          Species of plants planted in riparian
          Salix alaxensis, S. lasiandra, S. Sitchensis, Populus balsamnifera, Calamagrostis canadensis, Deschampsia beringensis, D. caespitosa, Leymus mollis, Festuca rubra
        •      . . . . . . C.5.c.3 Acres planted in riparian .1
        •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .01
      •      . . . . C.5.d.1 FencingY (Y/N)
        •      . . . . . . C.5.d.2 Miles of fence along stream .06
        •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing .1

2014 MOA N. Taku Lake    


  • Worksite Identifier: 2014 MOA N. Taku Lake
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Knik Arm (190204)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.1533
  • Longitude: -149.8788

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 81,410.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 65,983.00
      •      . . . . C.4.b Total length of instream habitat treated .02
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .02
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 15,427.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .02
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Salix alaxensis, S. lasiandra, S. Sitchensis, Populus balsamnifera, Calamagrostis canadensis, Deschampsia beringensis, D. caespitosa, Leymus mollis, Festuca rubra
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .10
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .06
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing .1
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

2013 Johnson Campbell Lake    


  • Worksite Identifier: 2013 Johnson Campbell Lake
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Knik Arm (190204)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.13336
  • Longitude: -149.946376

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 17,712.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,710.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 13,002.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Salix alaxensis, S. lasiandra, S. Sitchensis, Populus balsamnifera, Calamagrostis canadensis, Deschampsia beringensis, D. caespitosa, Leymus mollis, Festuca rubra
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .01
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .01
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing .1
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

2013 MOA DOT New Seward Hwy    


  • Worksite Identifier: 2013 MOA DOT New Seward Hwy
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Knik Arm (190204)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.174952
  • Longitude: -149.859618

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 119,259.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 94,250.00
      •      . . . . C.4.b Total length of instream habitat treated .02
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .02
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 25,009.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .02
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Salix alaxensis, S. lasiandra, S. Sitchensis, Populus balsamnifera, Calamagrostis canadensis, Deschampsia beringensis, D. caespitosa, Leymus mollis, Festuca rubra
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .02
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .11
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing .3
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

2013 MOA Valley of the Moon    


  • Worksite Identifier: 2013 MOA Valley of the Moon
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Knik Arm (190204)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.204542
  • Longitude: -149.895712

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 106,212.00
    •      . . C.0.b Length of stream treated/protected .11
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 28,274.00
      •      . . . . C.4.b Total length of instream habitat treated .11
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .11
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 77,938.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .11
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Salix alaxensis, S. lasiandra, S. Sitchensis, Populus balsamnifera, Calamagrostis canadensis, Deschampsia beringensis, D. caespitosa, Leymus mollis, Festuca rubra
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .11
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .11
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing .1

2012 MOA Wickersham Park    


  • Worksite Identifier: 2012 MOA Wickersham Park
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Knik Arm (190204)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.176416
  • Longitude: -149.845831

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,191.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,712.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 13,479.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Salix alaxensis, S. lasiandra, S. Sitchensis, Populus balsamnifera, Calamagrostis canadensis, Deschampsia beringensis, D. caespitosa, Leymus mollis, Festuca rubra
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .01
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .01
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing .1