Creel Clerk/Fish Technician I

Salmonid Research, Monitoring, and Evaluation (RM&E)

Monitoring
Project IDCCT11-1
Recovery Domains -
Start Date10/01/2011
End Date06/30/2013
Year2011
StatusCompleted
Last Edited01/14/2025
 
1 - 1

Description    


The 2012 fishery was monitored between July 1, 2012 through October 4, 2012. Information collected included: 1) estimated total angler effort by gear type and location; 2) estimated total harvest; 3) measurement of biological parameters (length, origin, mark type); 4) combined results with other tribal harvest efforts (selective and non-selective gear) to estimate total harvest of steelhead and total number of natural origin steelhead that are handled and released; and qualitatively evaluate fishing effort and catch at scaffold sites. Results of the PCSRF creel efforts are summarized in a technical memorandum dated January 9, 2013.

Project Benefit    


The continuation of this project will contribute to increased and sustainable salmon and steelhead populations by implementing effective monitoring and evaluation strategies.

Accomplishments

Metric Completed Originally
Proposed
Research and Monitoring
  Stream Miles Monitored 56.00 56.00

Funding Details

SourceFunds
PCSRF$78,952
Report Total:$78,952


Project Map



Worksites

33082250    


  • Worksite Identifier: 33082250
  • Start Date: 09/30/2011
  • End Date:
Area Description
Upper Columbia/Okanogan

Location Information

  • Basin: Upper Columbia (170200)
  • Subbasin: 17020006
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.081969008159525
  • Longitude: -119.12109374999822

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • E.0 Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
    •      . . E.0.a RM&E Funding 78,952.00
    •      . . E.0.b
      Complement habitat restoration project
      none
    •      . . E.0.c
      Project identified in a plan or watershed assessment.
      Upper Columbia Salmon Recovery Plan
    •      . . E.0.d.1 Number of Cooperating Organizations 0
    •      . . E.0.d.2
      Name Of Cooperating Organizations.
      none
    •      . . E.0.e.1 Number of reports prepared 1
    •      . . E.0.e.2
      Name Of Report
      none
    •      . . E.1 MonitoringY (Y/N)
      •      . . . . E.1.a Monitoring funding 78,952.00
      •      . . . . E.1.b.1 Stream Miles Monitored 56.00
      •      . . . . E.1.b.2 Acres of Watershed Area Monitored 10,000.0
      •      . . . . E.1.c.6 Harvest monitoringY (Y/N)
        •      . . . . . . E.1.c.6.a # miles (to nearest 0.01 mile) monitored for harvest 56.00
        •      . . . . . . E.1.c.6.b # square miles (to nearest 0.01 mile) monitored for harvest100 (Square miles)
        •      . . . . E.1.d
          Name Of Comprehensive Monitoring Strategy/Program
          The Okanogan Basin Monitoring and Evaluation Program.