Sitkoh Restoration Partnership
Salmonid Habitat Restoration and Acquisition
|
AK45969 | - | 04/14/2011 | 11/30/2012 | 2008 | Completed | 05/08/2024 | |
| |
Description
This project restored 1,800 feet of salmonid spawning and rearing habitat on the Sitkoh River in Southeast Alaska. Past logging practices destabilized the stream and caused it to flow down an adjacent logging road. This project restored the natural function of the stream and adjacent floodplain by installing log-jam structures in the stream and large wood structures in the floodplain.
Project Benefit
Bank stabilization and restoration of stream channel morphology will improve both the amount and quality of spawning and rearing habitat for pink and coho salmon and steelhead. These habitat improvements should result in more fish for commercial, sport, and subsistence harvest in the area. Improved catch rates across the noted fisheries will result in increased revenues for commercial fishermen and communities and more fish for consumption by sport and subsistence anglers and other consumers. Collaborative projects focused on the improvement of fish habitat that demonstrate successful results should result in more projects of a similar nature throughout the region.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.38 |
.34 |
Funding Details |
PCSRF | $83,000 |
Other | $41,219 |
Report Total: | $124,219 |
|
| |
Worksites
Southeast Alaska
- Worksite Identifier: Southeast Alaska
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.58833
- Longitude: -135.08953
ESU
- Un-Named ESU Pink
- Un-Named ESU Coho
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 124,219.00
- . . C.0.b
Length of stream treated/protected .38
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
M. Becker. 2009. Sitkoh River and Creek Watershed Opportunity and Restoration Plan. USDA Forest Service |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 124,219.00
- . . . . C.4.b
Total length of instream habitat treated .38
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .38
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .00
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 6
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .38
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 6
- . . . . . . C.4.d.6
Yards of average stream-width at mid-point of channel structure placement project10 (Yards)
- . . . . . . C.4.d.7
Number of structures placed in channel 6
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .76
|
|