GIS Support and Planning for the Lower Klamath

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID02-229
Recovery DomainsN CA - S Oregon
Start Date07/31/2003
End Date03/31/2004
Year2002
StatusCompleted
Last Edited01/14/2025
 
1 - 1

Description    


We conducted spatial data analysis for restoration planning projects in the Lower Klamath River estuary and the Salt Creek watershed.

Project Benefit    


1) Utlizing georeferenced aerial photographs, this project provides a comparison of habitat conditions in the Klamath River estuary and lower Salt Creek from 1930 to present, 2) Convert GPS data collected in the estuary of the Klamath River into a GIS database, 3) Aggregate GPS data files for water quality from the Estuary into a single data base.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$20,000
Report Total:$20,000


Project Map



Worksites

402    


  • Worksite Identifier: 402
  • Start Date: 07/31/2003
  • End Date: 03/31/2004
Area Description
Klamath Estuary

Location Information

  • Basin: Klamath (180102)
  • Subbasin: Lower Klamath (18010209)
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.517740858
  • Longitude: -124.0228060596

ESU

  • Southern Oregon / Northern California Coastal Chinook Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Klamath Mountains Province Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 20,000.00
    •      . . B.0.b.1 Area Encompassed 200.0
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 20,000.00
      •      . . . . B.1.b.10 Designing or maintaining restoration data systemsY (Y/N)
        •      . . . . . . B.1.b.10.a
          Name of plan implemented
          None
        •      . . . . . . B.1.b.10.b
          Description and scope of the plan implemented
          Not applicable