The property was appraised, negotiations with land owners completed, and final purchase was completed in early 2003. The 2.1-acre site includes approximately one-tenth of a mile of low-bank riparian habitat on Okanogan River. The riparian zone includes a mix of both native and non-native vegetation. Use of the Omak Creek reach adjacent to this site by Okanogan River summer steelhead for migration and rearing is documented. An assessment of need the need for riparian enhancements and weed control was completed. Noxious weed control measures were applied. Native vegetation was planted on site. All necessary permitting and ESA consultation was completed.

Project Benefit    


Project will protect important salmonid rearing and migration habitat in lower Omak Creek and along Okanogan River.

Accomplishments

Metric Completed Originally
Proposed
Land Acquisition
  Acres Acquired or Protected 2.1 2.1
  Stream Bank Miles Acquired
  or Protected
.10 .10
Riparian Habitat
  Stream Miles Treated
  Acres Treated .1

Funding Details

SourceFunds
PCSRF$59,049
Report Total:$59,049


Project Map



Worksites

67    


  • Worksite Identifier: 67
  • Start Date: 09/01/2002
  • End Date: 08/31/2003
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia (170200)
  • Subbasin: Okanogan
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Upper Columbia River
  • Latitude: 48.22
  • Longitude: -119.3

ESU

  • Upper Columbia River Summer- and Fall-run Chinook Salmon ESU
  • Upper Columbia River Steelhead DPS
  • Upper Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .06
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      See project CCT02-5. Canopy surveys are conducted annually. Stream conditions are monitored annually.
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.b.2 Total Riparian Acres Treated
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
      •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
        •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control
      •      . . C.10 Land or Easement AcquisitionY (Y/N)
        •      . . . . C.10.c.1 Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
          •      . . . . . . C.10.c.5 Miles of streambank protected by land or easement acquisition .10
          •      . . . . . . C.10.c.6 Acres of land, wetland or estuarine area acquired 2.1