Steelhead Kelt Reconditioning Feasibility Study

Salmonid Hatcheries and Harvest Management

Hatchery Production
Project IDCCT01-2
Recovery DomainsUpper Columbia River
Start Date12/04/2001
End Date08/31/2004
Year2001
StatusCompleted
Last Edited01/27/2024
 
1 - 1

Description    


A contract was developed with a subcontractor in December of 2001 to complete the feasibility study. The study was completed in April of 2002. Results indicated that while the proposed kelt reconditioning program may not truly mimic natural pre-dam life history for Okanogan steelhead, it could serve as a valuable experimental interim recovery strategy for endangered Upper Columbia ESU summer steelhead. The report included specific recommendations for kelt trapping/release; reconditioning facility development; staff training; hold, feed and reconditioning at the Cassimer Bar Facility; monitoring and evaluation; adaptive management; and termination criteria. As an additional component of this project, kelt reconditioning was also addressed in a draft Okanogan Basin summer steelhead HGMP.

Project Benefit    


Improve repeat spawning success of Upper Columbia ESU summer steelhead.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$24,941
Report Total:$24,941


Project Map



Worksites

1273    


  • Worksite Identifier: 1273
  • Start Date: 12/04/2001
  • End Date: 05/01/2002
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia (170200)
  • Subbasin: Chief Joseph
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Upper Columbia River
  • Latitude: 47.9894356308357
  • Longitude: -119.645237763848

ESU

  • Upper Columbia River Steelhead DPS
  • Upper Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding 24,941.00
    •      . . D.1 Hatchery Production ProjectY (Y/N)
      •      . . . . D.1.a Hatchery Production Funding 24,941.00
      •      . . . . D.1.c.1 Hatchery operations - facility or equipmentY (Y/N)