Clearing Backlog of Genetic Analyses
Salmonid Research, Monitoring, and Evaluation (RM&E)
|
2002-5-05 | - | 06/01/2002 | 12/31/2004 | 2002 | Completed | 05/01/2025 | |
| |
Description
The primary goal of this project was to hire a laboratory technician to process the backlog of genetic samples in our possession. Analyzing these samples provided for the improved understanding of genetic interactions and variability of several salmon and steelhead populations in the Columbia Basin. DNA has been extracted from approximately 10,000 tissue samples from projects including: Fall Chinook Salmon Stock Composition (PCSRF 2002-5-04), Snake River steelhead kelts, Klickitat River steelhead, South Fork Salmon River Chinook salmon, and Clearwater River Chinook salmon.
Project Benefit
DNA has been extracted from approximately 10,000 tissue samples from projects including: fall Chinook salmon stock composition in the Columbia Basin, Snake River steelhead kelts, Klickitat River steelhead, South Fork Salmon River Chinook salmon, and Clearwater River Chinook salmon. Hiring a technician will bring CRITFC up to date on genetic sample analysis and report writing.
The project resulted in Identification of three distinct fall Chinook stocks, genetic structure of Chinook salmon in the South Fork Salmon River, and a better understanding of genetic variability of native steelhead in the Klickitat River and influences from an introduced hatchery stock.
Funding Details |
PCSRF | $63,604 |
Report Total: | $63,604 |
|
| |
Worksites
CRITFC Office
- Worksite Identifier: CRITFC Office
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Snake (170402)
- Subbasin: Upper Snake-Rock
- Watershed: 1709001203
- Subwatershed:
- State: Idaho
- Recovery Domain:
- Latitude: 42.771
- Longitude: -114.901
ESU
- Snake River Spring/Summer-run Chinook Salmon ESU
- Snake River Fall Chinook Salmon ESU
- Middle Columbia River Steelhead DPS
- Un-Named ESU Chinook
- Un-Named ESU Coho
Map
Photos
Metrics
Metrics
- E.0
Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
- . . E.0.a
RM&E Funding 63,604.00
- . . E.0.b
Complement habitat restoration project | |
none |
- . . E.0.c
Project identified in a plan or watershed assessment. | |
none |
- . . E.0.d.1
Number of Cooperating Organizations 10
- . . E.0.d.2
Name Of Cooperating Organizations. | |
Pacific Salmon Commission (Bonneville sampling, Hanford Reach juvenile sampling), Bonneville Power Administration (Through the Nez Perce Tribe, Confederated Tribes of the Umatilla Indian Reservation, Confederated Tribes of the Warm Springs Reservation of Oregon, Confederated Tribes and Bands of the Yakama Nation, and Columbia River Inter-Tribal Fish Commission) Washington Department of Fish and Wildlife, Oregon Department of Fish and Wildlife, and NOAA-Fisheries. |
- . . E.0.e.1
Number of reports prepared 3
- . . E.0.e.2
Name Of Report | |
CRITFC, Semi-annual PCSRF Progress Reports |
- . . E.2
ResearchY (Y/N)
- . . . . E.2.a
Research Funding 63,604.00
- . . . . E.2.b.2
tissue sampling and analysisY (Y/N)
- . . . . . . E.2.b.2.a
Key issues addressed by tissue sampling and analysis research | |
Analyzing these samples provided for the improved understanding of genetic interactions and variability of several salmon and steelhead populations in the Columbia Basin. |
|
|