East Fork Irrigation District Central Lateral Canal II

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID2002-3-07
Recovery DomainsLower Columbia River
Start Date08/01/2003
End Date12/31/2004
Year2002
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


This project is complete. The PCSRF funds were spent on the purchase of the Weholite pipe. The first phase of the larger, multi-year ($10.5 million) project that this contributes to have been completed, representing about 1/3 of the overall project. Included in this phase was welding and burying about 3000 feet of 72 inch diameter Weholite pipe, burying 900 feet of concrete sewer pipe and installing a debris screen at the upper end of the project. The other two phases will be completed in FY 05 and 06.

Project Benefit    


Restore adult and juvenile fish passage, eliminate sediment, and improve water quality in Neal Creek. Restore natural stream flow in East Fork Hood River.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 12.00 12.00

Funding Details

SourceFunds
PCSRF$83,827
Report Total:$83,827


Project Map



Worksites

Neal Creek    


  • Worksite Identifier: Neal Creek
  • Start Date: 08/01/2003
  • End Date: 12/31/2004
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Middle Columbia (170701)
  • Subbasin: Middle Columbia-Hood
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Lower Columbia River
  • Latitude: 45.558
  • Longitude: -121.589

ESU

  • Lower Columbia River Coho Salmon ESU
  • Lower Columbia River Steelhead DPS
  • Middle Columbia River Steelhead DPS
  • Un-Named ESU Coho
  • Un-Named ESU Bull Trout
  • Lower Columbia River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 83,827.00
    •      . . C.0.b Length of stream treated/protected .41
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      The M&E for this project will include spawning and juvenile fish surveys in the stream including the reach upstream of the diversion dam. Continued fish salvage in the irrigation canal will be coordinated with EFID to eliminate entrainment of residual fish that live and over winter in the Eastside Irrigation Canal.
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 83,827.00
      •      . . . . C.2.b.1 Length of stream made accessible 12.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 12.00